Pull Out Testing, Tension Tests, Eye Bolt and Anchor Bolt Testing, Cheshire
Pull out testing in Cheshire is normally performed to establish how strong the fixings are between a typical fixing and concrete and many other securing materials.
Even though materials used for
bonding may be different, the
actual testing principles remain
the same for all types of fixings.
Pull out testing and tensile
strength testing is usually
performed because many factors
which effect bonding of
materials. The greatest concern is
that weaknesses may not be noticed
when only visual inspection is
conducted.
Some of these factors are: degraded strength of the bonding material caused by low temperature, frost, or when contaminants infiltrates into the joint.
Another cause of poor surface bonding strength is as a result of smooth side walls.
The entire strength of the
whole structure may be weaker so
as to loose the integral strength
of the structure due to the vital
bonding materials fail.
Ultimately, this may result in
construction malfunctions leading
to disastrous consequences. Pull
Out Testing enables early
diagnosis of such problems.
Because of this, constructors can
repair faults. Early fault
detection mitigates future higher
costs. This also gives an
assurance of any fixings overall
strength.
Push pull testing is conducted
either on a wide test batch or a
smaller intensive scale. Testing
always entails duplication of the
design maximum stress levels
planned in construction as
stipulated by the standards of the
industry.
Push pull testing in Cheshire
is a detailed
stress testing study of the
performance of bonded materials.
If problems have been detected
then pull out testing can be used
to rapidly find out the scale of
any problem.
Quicker pull out testing (larger
sample testing) may be used under
the circumstances where the
financial feasibility of the large
scale is far reaching and faults
have been detected.
Pull out tests can quickly test
more fixings and will only show
the pass or fail of maximum loads
being tested. The test methods are
identical as push pull tests but
only the pass or failure is
recorded. Push pull testing is
normally used to detect problems
the quicker pull out tests will
find out the extent of such
problems.